SATURDAY 28 NOV 2026 · ORDERS, YARDS, PROGRAMS Advertise Find suppliers on DefMatch
AMPHIBIOUS AND SUPPORT ITALY

Fincantieri Signs $549M Deal With OCCAR for Italian Navy’s Third Logistic Support Ship

Fincantieri and Leonardo will build a third Logistic Support Ship for the Italian Navy at Castellammare di Stabia under a $549 million OCCAR contract amendment, with delivery by 2030.

OCCAR Director Joachim Sucker and Fincantieri Naval Vessels Division General Manager Eugenio Santagata sign the contract for a third Logistic Support Ship at Muggiano, Italy.
OCCAR Director Joachim Sucker and Fincantieri Naval Vessels Division General Manager Eugenio Santagata sign the contract for a third Logistic Support Ship at Muggiano, Italy. Photo: Fincantieri

A Fincantieri-led industrial grouping has signed a contract amendment with OCCAR to build a third Logistic Support Ship (LSS) for the Italian Navy, in a deal worth about $549 million (500 million euros), Fincantieri said on November 26. The ship will be built entirely at Fincantieri’s Castellammare di Stabia shipyard, with delivery scheduled by 2030.

About $97 million (88 million euros) of the total is subject to options. Fincantieri’s share is about $454 million (414 million euros), including about $41 million (37.5 million euros) in options. Leonardo, which takes part in the grouping, holds about $93 million (85 million euros), including about $55 million (50 million euros) in options.

OCCAR Director Joachim Sucker and Eugenio Santagata, general manager of Fincantieri’s Naval Vessels Division, signed the amendment at the Muggiano Integrated Shipyard. Admiral Fabio Gregori, deputy chief of staff of the Italian Navy, and Vice Admiral Cristiano Nervi, director of the Naval Armaments Directorate, attended, along with Matteo Cardone of Leonardo’s Electronics Division.

Third Hull After Vulcano and Atlante

The new ship will join Vulcano and Atlante, the first two LSS units, which Fincantieri delivered to the Italian Navy in March 2021 and December 2025. Both were ordered under Italy’s multi-year fleet renewal program known as the Naval Law.

The French Navy has also adopted the design under its FLOTLOG program, which covers ships derived from the Italian LSS and built in collaboration with the Castellammare di Stabia yard, according to the company.

“This new order confirms the strength of the growth trajectory we have outlined for our Defense business and gives concrete substance to the commercial prospects announced in recent months,” Fincantieri CEO Pierroberto Folgiero said.

Specifications and Suppliers

Like the first two ships, the third LSS will be about 193 meters long with a maximum beam of 24 meters and a displacement of about 27,500 tons. It will reach a top speed of about 20 knots.

Fincantieri said the ship will build on developments from other naval renewal programs. It will carry the new SADOC5 combat management system, network protection at a higher security classification level, and increased satellite communications capacity, which require corresponding changes to the platform.

Work will be spread across the Fincantieri group. Fincantieri NexTech will supply automation systems and cybersecurity infrastructure. The group’s Mechanical Systems and Components Hub will supply shaft lines, steering gear, bow thrusters, stabilizing fins and other handling equipment.

Fincantieri listed the order as price sensitive and said it adds to the workload at Castellammare di Stabia, which the company described as a production hub for its naval vessels.

Also on the Ways